Roadworks are to take place in Hull.
Essential repairs to Willerby Road will be carried out later this year.

Weekly roadworks update – November 26

This week, it was announced that overnight resurfacing works would be taking place in Chamberlain Road and Stoneferry Road from Monday 6 December in the latest phase of the Stoneferry improvement scheme.

The work, which is expected to last about a week, will be carried out from 7pm to 6am, Monday to Friday (including Saturday morning).

During the work, the Chamberlain/Stoneferry roundabout and part of Chamberlain Road will be closed.

Councillor Dean Kirk, portfolio holder for transportation, roads and highways said: “With the Stoneferry improvement scheme, we are improving access and use for thousands of residents and businesses in the area. We apologise for any inconvenience caused.”

Read more

A breakdown of planned works taking place across Hull has been detailed below:

Location Start Date Due Date Reason Utility/HCC Name
A63 improvement scheme – Porter Street Bridge 29/11/21 3/12/21 Porter Street Bridge works. Overnight closures 8pm – 6am. A63 eastbound from Brighton Street to Roger Millward Way. A63 westbound from Roger Millward Way to Daltry Street. National Highways
A63 improvement scheme – Commercial Road 26/10/21 30/4/22 Enable H&S and safe systems of works for operatives working on the scheme National Highways
A63 improvement scheme –  St James Street to  Market place 1/5/20 1/5/25 Lane closures and local diversions until completion of scheme. LGV diversion signed via ERYC to limit number of LGVs in city centre. National Highways
Anlaby Road 30/11/21 30/11/21 Removal of artwork to pedestrian crossing near junction of Coltman Street. Contraflow from 7pm to 11pm. MP&I
Argyle Street 12/12/21 12/12/21 Disconnect water supply. Footpath closure with walkway in carriageway at exit from NHS car park Yorkshire Water
Barham Road 29/11/21 23/1/22 Carriageway Resurfacing and concrete repairs HCC – MP&I
Beverley Road cycle scheme 23/8/21 3/12/21 Implementation of cycle scheme. Queens Road/ Beverley Road and Cottingham Rd/Clough Road junctions. HCC – MP&I
Beverley Road cycle scheme 14/10/21 17/12/21 Construction of off-line cycle track. Hall Road to City Boundary outbound. Lane closure throughout duration of works. HCC – MP&I
Beverley Road cycle scheme 22/10/21 3/12/21 Implementation of cycle scheme. Mizzen road to Hall Road Inbound. 9.30am to 3.30pm lane closures HCC – MP&I
Beverley Road – Brunswick Arcade 4/10/21 1/9/22 Brunswick Arcade demolition. Contraflow in place until April 2022. Lane closure in place until Sept 2022 HCC – MP&I
Beverley Road 8/12/21 9/12/21 Slot cutting. Beverley Road outbound between Mizzen Road and Hall Road. Lane closure 9.30am to 3.30pm StreetScene – Traffic Signals
Beverley Road 9/12/21 10/12/21 Slot cutting. Beverley Road inbound to Mizzen Road. Lane closure 9.30am to 3.30pm StreetScene – Traffic Signals
Bowlalley Lane 18/10/21 17/12/21 Footway Scheme. Extended to include carriageway. Road closure HCC – MP&I
Hall Road 10/12/21 10/12/21 Slot cutting. Multi-way lights on junction with Inglemire Lane. Works between 9.30am and noon StreetScene – Traffic Signals
Hessle Road (12-month Scheme) 23/8/21 4/9/22 Footway reconstruction HCC – MP&I
Holderness Road 6/12/21 6/12/21 Slot cutting for traffic signal loops. Signals on junction of Holderness Road and Southcoates Lane. Works to take place between 9.30am and 3.30pm StreetScene – Traffic Signals
Holderness Road  (Victor St to Southcoates) (PHASES 1-8) 27/9/21 1/11/22 Full footway reconstruction scheme. HCC – MP&I
Holderness Road 21/12/21 23/12/21 Lane closure for work to existing telecoms site in the central verge near  Summergangs Lane. T-Mobile Ltd
Holderness Road to Ganstead Roundabout 29/11/21 1/12/21 Essential  works to install communications pole. Four-way signals to be a place during pole lift from 6.30pm to 11.30pm. Carriageway will be clear at all other times. T – Mobile
Lowgate Footway Scheme – Lowgate 1/11/21 10/1/22 Footway repair scheme. Closed northbound from A63 to North Church Side. A63 slip road closed. Lane open southbound from Alfred Gelder Street to A63. HCC – MP&I
Lowgate Footway Scheme – Market Place 22/10/21 22/12/21 Footway repair scheme. East footway – no carriageway incursion. Except on occasions, parking bays removed to provide walkway HCC – MP&I
Midmere Ave 22/11/21 30/11/21 Carriageway repair works. Multi-way signals at junction with Dorchester Road/Midmere Ave. Work to take two hours only between these dates. Streetscene – Highway Ops
Saltshouse Road 1/11/21 12/1/22 Installation of two new pedestrian refuge islands between Dunvegan Road and Clear View Close HCC-MP&I
Spring Bank West 25/10/21 18/12/21 Upgrading network. Opposite Albert Ave to Tile Giant (footway, carriageway) HCC – Streetscene Signals
Stoneferry Rd Scheme – Woodhall Street to Lorraine Avenue 1/4/21 28/5/22 Major Improvement Scheme commissioned by HCC  – Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall street junction are now completed HCC – MP&I
Stoneferry Rd Scheme – Chamberlain Road to Bandstand roundabout 23/4/21 25/6/22 Major improvement scheme commissioned by HCC  – Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall street junction are now completed HCC – MP&I  COLAS
Stoneferry Rd Scheme – Ferry Lane roundabout to Bandstand roundabout. 9/11/21 17/11/21 Road surfacing. Stoneferry Road – northbound only between Ferry Lane roundabout and Bandstand roundabout. Weeknight closures 7pm-6am HCC – MP&I  COLAS
Stoneferry Rd Scheme – Bandstand roundabout 26/11/21 29/11/21 Roundabout closed for road surfacing and repair work from 7pm Friday to 6am Monday. Foredyke Avenue to be two-way with restricted parking. HCC – MP&I  COLAS
Stoneferry Rd Scheme – Bandstand roundabout 3/12/21 6/12/21 Roundabout closed for road surfacing work from 7pm Friday to 6am Monday. Foredyke Avenue to be two-way with restricted parking. HCC – MP&I  COLAS
Stoneferry Rd Scheme – Sutton Road 24/11/21 3/12/21 Resurfacing to Sutton Road. Sutton Road closed in both directions between Ennerdale / Stockholm Road roundabout and Holwell Road roundabout. Overnight works 7pm-6am on  Nov 24-25 and Nov 29-Dec 2. HCC – MP&I  COLAS
Stoneferry Rd Scheme – Chamberlain Road 6/12/21 11/12/21 Resurfacing to Chamberlain Road and roundabout.  Closure of Chamberlain Road roundabout on Stoneferry Road and along Chamberlain Road to opposite No 194. Access to/from Lorraine Street will be maintained by marshalling. Works to take place overnight. HCC – MP&I  COLAS
Wincolmlee (Phase 1) 13/12/21 17/1/22 Essential work to upgrade power supply. Multi-way signals, to be manned during traffic-sensitive times. All traffic management to be removed during Christmas closedown. Northern Power Grid
Queen Victoria Square Christmas