Weekly roadworks update – June 10

The Run for All Hull Running Festival returns to the city’s streets this weekend, with new routes for 2022.

The Hull Half Marathon and Hull 10K will take place on Sunday June 12, starting and finishing on Cottingham Road.

For the safety of all participants, there will be staggered road closures between 4am and 3pm on Sunday.

For full details on road closures, times and diversions, visit Run for All website

Below is a breakdown of roadworks taking place across Hull over the next few weeks. All works are subject to change. For the latest updates:

LocationStart dateDue dateSummary of worksUtility/HCC name
A63 improvement scheme - St James Street to Market Place01 May 202001 May 2025Lane closures and local diversions until completion of scheme. LGV diversion signed via ERYC to limit number of LGVs in city centre.National Highways
A63 improvement scheme - Commercial Road26 October 202130 April 2024Enable H&S and safe systems of works for operatives working on the scheme.National Highways
Beverley Road - Brunswick Arcade04 October 202101 April 2023Brunswick Arcade demolition. Contraflow in place until April 2022. Lane closure in place until Sept 2022.HCC - MP&I
Calvert Lane16 May 202210 July 2022Carriageway resurfacing scheme from approximately 50m north of Boundary Way to Calvert Lane fire station. Road closed. Diversion in place. Access to be maintained at all times.HCC - MP&I
Chapman Street04 July 202208 July 2022Replacement / full site refurbishment of traffic signals and controller. Multi-way signals.StreetScene - Traffic Signals
Charles Street04 April 202215 June 2022Works between Francis Street and Bridlington Avenue, including work in the carriageway and footpath. Removal of existing line markings, installation of new gullies and kerbs to construct off-road cycle track. New surfacing and line markings. Multi-way signals, to be manned at peak times. HCC - MP&I
Cleveland Street13 June 202208 July 2022Movement of traffic island. Near junction of Bedford Street. Lane closure. Two-way signals to be in place for one night only.HCC - MP&I
Great Union Street23 May 202226 June 2022Resurfacing / concrete repairs. Full road closure. Access to be maintained at all times for businesses via A63 / Clarence Street.HCC - MP&I
Hawthorne Avenue20 June 202224 June 2022Level crossing and track survey. Lane closure with two-way signals from 11pm - 5.30am.Network Rail
Hessle Road (12-month Scheme)23 August 202104 September 2022Footway reconstruction.HCC - MP&I
High Street16 May 202218 July 2022Laying ducting, kerbs/ edgings, installation of cobbled paving under Myton Bridge. Multi-way signals.National Highways
Holderness Road (Victor St to Southcoates) (PHASES 1-8)04 January 202211 September 2022Full footway reconstruction scheme.MP&I - Highways Strategy & Design
Park Street06 June 202217 June 2022Replacement of gas main. Westbound road closure (Caughey Street to Spring Bank). No access from Spring Bank. Access from Park Street to Spring Bank still available.Northern Gas Network
Priory Way01 April 202231 March 2023Major improvement scheme.HCC - MP&I
Stoneferry Rd Scheme - Woodhall Street to Lorraine Street01 April 202101 July 2022Major Improvement Scheme commissioned by HCC - Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall Street junction are now completed.HCC - MP&I
Stoneferry Rd Scheme - Chamberlain Road to Bandstand Roundabout23 April 202101 July 2022Major improvement scheme commissioned by HCC - Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall Street junction are now completed.HCC - MP&I / Colas
Stoneferry Rd Scheme - Bandstand Roundabout10 June 202211 June 2022Installation of loop detectors for new traffic signals. Overnight road closure (7pm to 6am) on south side of Bandstand Roundabout between Stoneferry Road legs.HCC - Colas
Stoneferry Rd Scheme - Bandstand Roundabout11 June 202212 June 2022Installation of loop detectors for new traffic signals. Overnight road closure (7pm to 6am) on northern side of Bandstand Roundabout between Holwell Road exit and entry.HCC - Colas
Stoneferry Rd Scheme - Bandstand Roundabout12 June 202213 June 2022Installation of loop detectors for new traffic signals. Overnight road closure (7pm to 6am) on west side of Bandstand Roundabout between West Carr Lane exit and entry.HCC - Colas
Stoneferry Rd Scheme - Leads Road25 April 202229 July 2022Renew footpaths and kerbs. Leads Road closed westbound between Rotterdam Road and Bandstand Roundabout during works.HCC - MP&I COLAS
Stoneferry Rd Scheme - Leads Road29 July 202201 August 2022Carriageway resurfacing. Leads Road closed in both directions between Rotterdam Road and Bandstand Roundabout from 7pm on Friday 29 July to 6am on Monday August 1.HCC - MP&I COLAS
Stoneferry Rd Scheme - Sutton Road03 May 202201 July 2022Reconstruction of the new junction under temporary traffic lights to enable removal of the existing permanent traffic signals. Multi-way signals to run in phases to help minimise disruption. Leads Road / Sutton Road junction.HCC - MP&I
Stoneferry Rd Scheme - West Carr Lane10 June 202211 June 2022Installation of Loop detectors for the new traffic signals and High Friction surfacing and road markings. Overnight road closure (7pm to 6am) from Bandstand Roundabout to entrance of NR Burnett.HCC - Colas
Wincolmlee / Cumberland Street20 June 202217 July 2022Carriageway resurfacing and concrete repairs. Road closures on Cumberland Street (between Swann Street and Wincolmlee) and Wincolmlee (between Cumberland Street and Lincoln Street).HCC- MP&I