Roadworks
Roadworks are taking place across the city

Weekly roadworks update – 7 January

Beginning Monday 10 January, Rawling Way will see some resurfacing and concrete repairs, with road closure taking place between 7.30pm and 6.30am to minimise disruption.

Works to Barham Road to resurface the road and repair concrete, which were due to finish on Sunday 23 January, will now be completed by Sunday 6 February. The road will be closed throughout the duration of the works.

Below is a breakdown of roadworks taking place across Hull over the next few weeks:

Location Start Date Due Date Reason Utility/HCC Name
A63 improvement scheme – Commercial Road 26/10/21 30/4/22 Enable H&S and safe systems of works for operatives working on the scheme National Highways
A63 improvement scheme –  St James Street to Market place 1/5/20 1/5/25 Lane closures and local diversions until completion of scheme. LGV diversion signed via ERYC to limit number of LGVs in city centre. National Highways
A63 improvement scheme – Daltry Street to Rodger Milward Way 18/1/22 21/1/22 Road will be closed from 8pm – 6am. National Highways
Barham Road 29/11/21 6/2/22 Carriageway resurfacing and concrete repairs. HCC – MP&I
Beverley Road 5/1/22 14/1/22 Surfacing to cycle track and footpath, topsoil to verge followed by line removal and new lining to centralise lanes, plus anti-skid at Downfield Avenue Junction, which will remain open. HCC – MP&I
Beverley Road – Brunswick Arcade 4/10/21 1/9/22 Brunswick Arcade demolition. Contraflow in place until April 2022. Lane closure in place until Sept 2022. HCC – MP&I
Beverley Road – Mizzen Road to Windle Avenue 4/1/22 11/2/22 Construction of new cycle track and footpath on the existing footpath and verge. Lane closure. MP&I ARBPMLTD
Eglinton Avenue 21/2/22 4/3/22 Road closure due to gas mains replacement on Ings Road. Northern Gas Network
Hessle Road (12-month Scheme) 23/8/21 4/9/22 Footway reconstruction. HCC – MP&I
Holderness Road (Victor St to Southcoates) (PHASES 1-8) 4/1/22 11/9/22 Full footway reconstruction scheme. MP & I – Highways Strategy & Design
Holderness Road – Holland Street to Sherburn Street 4/1/22 13/2/22 Footway reconstruction and repaving. MP & I
Holderness Road 24/1/22 11/2/22 Excavate and locate cable, joint new cable and reinstate excavations for new connection. SWB MASS MARKET Z3
Ings Road 14/2/22 11/3/22 Works to footway and carriageway. Northern Gas Network
Leads Road 17/1/22 21/1/22 Affecting Truro Close junction, repairs to road. MS3 Networks Ltd
Lowgate Footway Scheme – East side 17/1/22 8/4/22 Alfred Gelder Street to North Church Side, road closures between 7.30pm and 6.00am, Monday to Saturday. HCC – MP&I
Lowgate Footway Scheme – Lowgate 1/11/21 10/1/22 Footway repair scheme. Closed northbound from A63 to North Church Side. A63 slip road closed. Lane open southbound from Alfred Gelder Street to A63. HCC – MP&I
Lowgate Footway Scheme – Market Place 22/10/21 17/1/22 Footway repair scheme. East footway – no carriageway incursion. Except on occasions, parking bays removed to provide walkway. HCC – MP&I
Portland Place 4/1/22 21/1/22 Essential gas repairs. Road closure, traffic to follow diversion. Northern Gas Network
Priory Way 22/2/22 23/2/22 Major widening and construction of three signalised junctions. HCC – MP&I
Rawling Way 10/1/22 17/1/22 Resurfacing and concrete repairs. Proposed closure between 7.30pm and 6.30am. HCC – MP&I
Saltshouse Road 1/11/21 12/1/22 Installation of two new pedestrian refuge islands between Dunvegan Road and Clear View Close. HCC-MP&I
Savoy Road 14/2/22 3/3/22 Road closure due to gas mains replacement on Ings Road. Northern Gas Network
Silver Street 4/1/22 31/1/22 Road closure due to istallation of automated bollards. HCC – MP&I
Stoneferry Rd Scheme – Woodhall Street to Lorraine Avenue 1/4/21 28/5/22 Major Improvement Scheme commissioned by HCC  – Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall street junction are now completed HCC – MP&I
Stoneferry Rd Scheme – Chamberlain Road to Bandstand roundabout 23/4/21 25/6/22 Major improvement scheme commissioned by HCC  – Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall street junction are now completed HCC – MP&I  COLAS
Stoneferry Rd Scheme TBC/2/21 TBC/2/21 Resurfacing to mainline carriageway at the Ferry Lane roundabout. Overnight road closure. HCC – MP&I  COLAS
Wincolmlee (Phase 1) 13/12/21 17/1/22 Essential work to upgrade power supply. Multi-way signals, to be manned during traffic-sensitive times. All traffic management to be removed during Christmas closedown. Northern Power Grid
Wincolmlee (Phase 2) 31/1/22 18/3/22 New connection and cable upgrades. Road closure. Northern Power Grid